water pump
dryer motor
pelletizer motor
Process:
- Check that water tank is filled with water
- Turn control to “manual”
- Close cutting chamber
- Press “manual downstream start” on the control panel
- Check water pump
- Check rotation direction of water pump
- Check dryer motor
- Check rotation direction of dryer motor
- Press “manual pelletizer start”
- Check pelletizer motor
- Check rotation direction of pelletizer motor
- Walk around EUP and downstream equipment and check for (water) leakages
- Press “manual pelletizer stop”
- Press “manual downstream stop”
Next step: Grind knife carrier
Previous step: Check diverter valve
Start-Up Part 2: Initial Operation
progress
80%
Start-Up
progress
58%