Adjust height of EUP to extruder

Attention: Before adjusting the height, heat both pelletizer and extruder to operating temperature!

Process:

  1. Measure height of extruder (with tape measure)
  2. Measure height of EUP (with tape measure)
  3. Adjust height of EUP to extruder (height of EUP is adjusted by nuts/threaded rods on lower frame)
  4. Check height of EUP
  5. Check if EUP is horizontal
  6. Fix height of EUP (nuts on lower frame)
  7. Final check to see if the set height matches the layout
  8. Measure distance between adapter and extruder with feeler gauge

Next step: Connect EUP to extruder (C-clamp)

Previous step: Overview start-up

Start-Up Part 1: Preperation
progress 14%
Start-Up
progress 5%